There’s no rest for the wicked

29th November 2016
Source: Geberit
Posted By : Anna Flockett
There’s no rest for the wicked

The MRC Laboratory of Molecular Biology (LMB) was able to stay operational while a compressed air system was installed, thanks to Geberit Mapress’ no hot works benefits. Installed to match the existing copper system in the LMB's £212m purpose-built building, Geberit Mapress was chosen to provide work where pipework was exposed.

The LMB remained functional and occupied while a compressed air system was being installed, so soldering could have posed a risk to building users.

Gary Smith, from GRS Mechanical, said: "We had to match an existing compressed air installation constructed from 22mm copper braised joints. Now a fully functioning building, it was hard to get a ‘hot works permit', so Geberit Mapress was the obvious choice.”

Smith added: “As ever with Geberit Mapress, the installation went smoothly and the customer is extremely happy with the end result."


You must be logged in to comment

Write a comment

No comments




More from Geberit

Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

The Magnetics Show US
22nd May 2024
United States of America The Pasadena Convention Center
2024 World Battery & Energy Storage Industry Expo (WBE)
8th August 2024
China 1st and 2nd Floor, Area A, China Import and Export Fair Complex