Supply and install success for Börger Pumps at Flag Fen

14th September 2011
Posted By : ES Admin
Supply and install success for Börger Pumps at Flag Fen
Börger has completed the supply and installation of its PL300 Rotary Lobe Pumps to handle a demanding sludge application at the 5.6 hectares Flag Fen WWTW in Peterborough.
Appointed as main contractor by Anglian Water, Börger’s supply and installation has also included integration into existing control panels, as well as the removal of old equipment.

Efficiently transferring high volumes of imported sludge, Börger’s Pumps are already proving a key addition to one of the UK’s most demanding WWTWs, as Flag Fen’s Site Supervisor, Simon Pavitt explains:

“This can sometimes be a challenging site. It requires highly effective and reliable equipment to treat over 54,000 cubic metres of waste each day from more than a quarter-of-a-million people”.

He added: “The large sludge lanes at Flag Fen can make it quite a difficult duty, but Börger’s Pumps (operating at 5-Bar) have proved a good investment and are very easy to maintain”.

This latest installation follows Börger’s work for Anglian Water at Caister-on-Sea sewage treatment works, where the introduction of new gravity belt feed pumps means that all sludge processing at the site is now handled by Börger pumps.


You must be logged in to comment

Write a comment

No comments




Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

GISEC Global
23rd April 2024
United Arab Emirates Halls 2-8 - Dubai World Trade Centre
The Magnetics Show US
22nd May 2024
United States of America The Pasadena Convention Center
2024 World Battery & Energy Storage Industry Expo (WBE)
8th August 2024
China 1st and 2nd Floor, Area A, China Import and Export Fair Complex