Chemwaste’s Site Manager Dave Walton, said: “We’ve worked closely with Börger to develop pumps that would be best able to withstand our very demanding process. Börger’s pressurised pre-chamber system pump has dramatically reduced downtime because our previous pumps became blocked up almost constantly and had to be taken out of service for complete stripping down”.
David Brown, Börger UK’s Managing Director, added: “We knew this application was going to be an extremely tough challenge but by Chemwaste giving us the opportunity to work with them and understand their process, we’re very pleased to have provided pumps that make life easier”.