Amec Foster Wheeler awarded engineering contract for Zeebrugge LNG terminal expansion

14th September 2015
Posted By : Jacqueline Regnier

Amec Foster Wheeler announces that it has been awarded a detailed engineering contract by Felguera IHI for the expansion of the Zeebrugge Liquefied Natural Gas (LNG) Terminal in Belgium.

The value of the contract, to be delivered over the next 15 months, has not been announced.

Amec Foster Wheeler’s scope includes detailed engineering of the boil-off gas recovery system and associated facilities as well as the inter-connection with the new LNG storage tank and the existing plant facilities.

Amec Foster Wheeler’s Group President for Asia, Middle East, Africa & Southern Europe, Roberto Penno, said: “We are a leading engineering provider in Europe and look forward to applying our significant technical expertise on this strategically important project for Belgium.”

Zeebrugge LNG Terminal is owned and operated by Fluxys LNG from Belgium. The appointed engineering, procurement and construction (EPC) contractor is a joint venture comprising Duro Felguera Oil & Gas, Felguera IHI and Balzola. The overall EPC expansion will consist of the design, construction and start-up of a boil-off gas recovery system and fifth LNG storage tank of the plant, which will be one of the largest in the world with a capacity of 180,000 Nm3.


You must be logged in to comment

Write a comment

No comments




Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

The Magnetics Show US
22nd May 2024
United States of America The Pasadena Convention Center
2024 World Battery & Energy Storage Industry Expo (WBE)
8th August 2024
China 1st and 2nd Floor, Area A, China Import and Export Fair Complex