Deploying energy management is a “win win” scenario

Many customers tell us that one of their biggest business costs is energy, so it would seem obvious that tackling and improving the problem would be the natural thing to do. However, this ignores the pressure of producing product and satisfying customer’s demands, which all food and beverage manufacturers face on a daily basis.

An argument often heard is that the energy bill is seen as a ”sunk cost” or that it is the necessary evil endemic in the production process and that “it is what it is.” The solution is often seen as merely negotiating the best tariff from the supply authority but this approach fails to recognise the opportunities that lie dormant within the existing automation control architecture to identify areas for improvement and with some investment in energy management, to deliver significant energy and cost savings.

Some of the perceived obstacles to implementing an energy management system include cost, ROI and disruption to the production process. Indeed it is seen that this perception alone is enough to prevent any further discussion in favour of continuous production needs. The counter argument to this must be that it is widely reported that adopting a holistic approach to energy management can return savings of up to 30%, surely this possibility cannot be ignored.

Another interesting fact is that it is reported that 20% of the UK’s total energy usage centres on industrial processes and that 60% of that energy is consumed by electric motors. A typical food and beverage production plant consists of a variety of machines often containing electric motors of various sizes and these are usually linked together by conveyors and handling systems, again brimming with electric motors.

It is a well-trodden argument that says fitting variable speed drives (inverters) to electric motors will save energy but this is easier to see on a mixer or compressor where the motors tend to be larger but on a conveyor the motors tend to be much smaller and the effect harder to see.
If this argument is indeed accepted then why is it that many motors on many plants do not adopt any form of energy reduction techniques?

Implementing intelligent control of plant equipment will create the possibility to dictate how it operates. This illustrates the difference between energy saving and energy management. Fitting an inverter to a mixer motor will save energy but understanding the energy usage of the production line, leads to the possibility of implementing an energy management control strategy.

How often are conveyors left to run during production downtimes or during extended breaks? Fitting an inverter to a conveyor and controlling the inverter from the line control system means that decisions can be made to, for example reduce the conveyor speed during downtimes (reducing speed saves energy) or switch off completely if that is the most appropriate decision. These decisions can be made intuitively by the overall control system and could be linked to production planning if we take it to the next stage.

Getting to the lofty heights of total energy management will seem a long and expensive road to anyone who has minimum or zero energy saving already implemented but like all good strategies it can be implemented in stages, evaluating the cost/benefit analysis along the way. The first place to start is to know what the current situation looks like. To implement this stage will certainly require some investment and this will depend on the control level network architecture that already exists. Programmable controllers, inverter drives and other control equipment are perfectly capable of offering up a raft of energy information.

They may not have been programmed to deliver this when installed but by engineering over and above the existing control program the information can be easily accessed. This extra engineering can be non-intrusive and does not have to affect the control program already present. Communication of this information can then be transferred across the control level network to a dedicated energy monitoring package, where full analysis can take place.

What if no control level network exists? The choices are in essence either implement one, or deploy metering on the perceived “hotspots” to directly feedback the energy information. A properly thought out and costed strategy will no doubt include both of these techniques, in whole or in part. The importance of this monitoring phase cannot be underestimated as this information will be vital in determining the next phase of the project. It is also highly likely during this phase that some behavioural problems will come to light, perhaps a particular shift tends to leave machines running and others don’t. Simply implementing a procedural change can often give immediate improvements and cost savings.

Even if this approach seems rather piece meal, it should be implemented as part of the “bigger picture” from the beginning as taking the holistic view will deliver the best results and the greater savings long term. Problem areas will be defined from this analysis and suitable actions can be taken, this will range from fitting inverters, as previously discussed, to implementing a full energy management control strategy and all points in between. It is vital that you engage with an automation supplier who can provide audits, proposals and have the capability of delivering a total solution.

Our inverter drives include an optimum excitation control feature which can deliver up to 12% extra energy saving over and above the standard energy saving available from an inverter drive. We have our Energy Control Pack which can provide a wireless metering solution for gathering energy information and our MX4Energy software solution allows total energy management of assets and the production environment. MX4Energy is also capable of monitoring non-electrical utilities such as oil, gas water etc. providing a total site management system.

Couple this to our adoption of open network technologies and this means that the Mitsubishi energy management solution can be added to the production facility regardless of the preferred automation supplier at the control level. Added value services can be provided from our System Service Group and these include; energy surveys and audits and project integration from our network of approved service agents and system integrators.

It is perfectly understandable why manufacturers are so concerned about achieving production targets, sometimes at the expense of all other considerations. However, energy is a considerable cost to any business and any strategy that can reduce that cost by up to 30% has to be considered.
It is proven that for relatively small levels of investment, significant savings can be made and it is clear that the cost of doing nothing will outweigh the cost of taking action.


You must be logged in to comment

Write a comment

No comments




Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

GISEC Global
23rd April 2024
United Arab Emirates Halls 2-8 - Dubai World Trade Centre
The Magnetics Show US
22nd May 2024
United States of America The Pasadena Convention Center
2024 World Battery & Energy Storage Industry Expo (WBE)
8th August 2024
China 1st and 2nd Floor, Area A, China Import and Export Fair Complex