shentongroup Generates Power For Temporary Hotel Accomodation At Silverstone

30th July 2012
Posted By : ES Admin
shentongroup Generates Power For Temporary Hotel Accomodation At Silverstone
shentongroup was in pole position when a portable hotel company required standby power for its transportable hotel accommodation for Silverstone, the UK’s premier motor racing venue. shentongroup was chosen for its ability to provide a fast, turnkey solution that would enable the movable hotel to be fully operational and ready to welcome guests within 48 hours of arriving at Silverstone.
shentongroup’s end-to-end solution included supplying two generators, distribution equipment and fuel tanks together with engineers to install, test and certificate the installation. The generators have been synchronised to run in parallel to increase flexibility in the event of sudden power disturbances. Also included in the package is 24/7 emergency call-out and a rapid refuelling service if required.

Portable hotel accommodation is a new concept in providing luxury accommodation for major events and festivals. The perfect answer for onsite accommodation, the portable hotel is loaded, stacked and transported quickly and efficiently to any destination by land, sea or air, then erected without the need of mains services. Each room is equipped with a comfortable bed, en-suite wet room with shower, basin and toilet as well as air conditioning, flat-screen TV, wireless Internet and two power points. shentongroup’s innovative, bespoke, standby generator solution supplies the necessary power to ensure all equipment can be operated within the hotel complex at the touch of a button.

“We are used to working with high profile clients and managing applications that are in high pressured environments”, says James Hawksworth of shentongroup’s rental division. “Our engineers worked closely with the client to ensure that the installation was carried out without a hitch. The standby power will be on site throughout Silverstone’s summer season”.

A leading provider of power support services, shentongroup’s rental division provides a rapid deployment of generators together with peripheral services that include cabling, fuel systems, fuel management and technical 24/7 on site engineering support. Generators ranging from 80kVA to 2MVA are strategically positioned around the UK so that they can be rapidly deployed to site. The generators and critical power support services are provided to companies for a wide range of applications including standby power during a planned shutdown.

You must be logged in to comment

Write a comment

No comments




Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

GISEC Global
23rd April 2024
United Arab Emirates Halls 2-8 - Dubai World Trade Centre
The Magnetics Show US
22nd May 2024
United States of America The Pasadena Convention Center
2024 World Battery & Energy Storage Industry Expo (WBE)
8th August 2024
China 1st and 2nd Floor, Area A, China Import and Export Fair Complex